Return to Search Results View Previous PropertyView Next Property

AN UNDISCOVERED PARADISE - BELLAVISTA APARTMENTS PUGLIA

 Region: Puglia

 Price: EUR € 112 000

 Bedrooms: 2

 Property Type: Apartment

 Development State: Off Plan

Click Here for a full sized picture
Click to View Click to View Click to View Click to View Click to View
 
Description:
An opportunity not to be missed! FANTASTIC LOW DEPOSIT - ONLY 20%

Puglia is hailed by many as 'the new Tuscany'. Bellavista apartments are ideal for those looking for an authentic Italian apartment close to some of Italys most beautiful beaches and only 1 hour from Brindisi airport. Relax on your roof top terrace with sea views.

The area, according to many, boasts some of the finest sandy beaches and crystal blue sea in Italy, with a shallow shelf, benefiting beach sports and children’s water activities.

• 1 hour Brindisi airport
• Large roof top terraces
• 2 bedrooms
• Parking
• 200 metres beach

Phase 1 comprises 32 units - 2 blocks facing each other consisting of 16 apartments, 8 on each floor. All units have a living space of 60m˛, a terrace of 30m˛ and an independent small garden with parking. They have 2 bedrooms, bathroom and living room with kitchen area. The top floor units also have a roof terrace, great for those evening barbeques.

These apartments are being built one block back from the sea road, approximately 200 metres from the beaches. All houses in the area are maximum 2 floors and Puglia in general will not allow high rise buildings.

The layout of the development is like a horseshoe, the 2 sides being phase 1 and the bottom of the U being phase 2. The opening of the U faces towards the sea, each block is independent and there is approx 25m between the 2 blocks of phase 1.

Phase 2 consists of 24 apartments.
The 24 apartments will be built to the same specification as Phase 1 with 12 apartments on both floors.

Payment Schedules and Completion Dates.

Phase 1. Ready Now. Hence the required deposit is 50%. Balance on completion.

Phase 2. Commenced in September/October 2007 and the completion date is anticipated to be June/July 2008. The deposit is 20% of the total cost and the 80% balance upon completion. BR

E-mail a friend
Bookmark